A meeting will be held tomorrow to help decide the future of the Hammond River Number 2 Covered Bridge in Quispamisis. Local residents are invited to attend. Officials with the provincial transportation department will present options for the bridge, which remains closed after being damaged by an overweight excavator fell through the bridge deck. The province is considering whether the bridge should be replaced by a new bridge or if the century old bridge is worth repairing.