Blackville bridge closure

Starting on Monday June 26th, the Southwest Miramichi River Bridge Number 2 in Blackville will be closed to all vehicle and pedestrian traffic as the decking and sidewalk are replaced.

Blackville Mayor Chris Hennessy says that there is a plan for emergency services access when the bridge is closed.

It will be off-limits for about 60 days.