Rehabilitation work on the Centennial Bridge (Miramichi River No. 1 bridge) will involve several overnight closures.
The third overnight closure is scheduled to begin 11 p.m. Sunday April 30 until 5 a.m. Monday May 1. Those closures will be repeated for the next four nights, concluding the morning of Friday May 5.
Throughout the summer, the bridge will be limited to a single-lane at a time. Traffic Control lights are placed on the bridge to control traffic flow. Single-lane service began the morning of April 10.
Work for the 2017 season is expected to conclude in October.