Repairs begin this week to the covered bridge in French Village which was damaged last fall when an excavator crashed through the decking.
The work should be done in the fall with a total cost of about $1 million.
Just another WordPress site
Repairs begin this week to the covered bridge in French Village which was damaged last fall when an excavator crashed through the decking.
The work should be done in the fall with a total cost of about $1 million.