Starting today, the Southwest Miramichi River Bridge Number 2 in Blackville will be closed to all vehicle and pedestrian traffic as the decking and sidewalk are replaced.
Blackville Mayor Chris Hennessy says that there is a plan for emergency services access when the bridge is closed.
It will be off-limits for about 60 daysStarting today, the Southwest Miramichi River Bridge Number 2 in Blackville will be closed to all vehicle and pedestrian traffic as the decking and sidewalk are replaced.
Blackville Mayor Chris Hennessy says that there is a plan for emergency services access when the bridge is closed.
It will be off-limits for about 60 days.